BIS SPACE project: Avalon, Armstrong factory, Island Zero

The British Interplanetary Society's rotating-settlement studies, presented to the thread mostly by lamontagne (a minor participant in the project).

Summary of what the thread established

  • Avalon (JBIS Oct 2019) lamontagne, 2023-09-28; lamontagne, 2023-09-29; lamontagne, 2023-09-29:
  • 1 km diameter, 10,000 people, contra-rotating, sun-facing, beamed power, 3 m walls.
  • The central habitat, hub and end spaceports rotate; the hub carries the radiators; each shell meets the 1.3:1 stability criterion.
  • A massive outer shield counter-rotates at lower rpm, joined at the perimeter by magnetic suspension with backup rails and wheels.
  • Rotating berthing docks carry ships to a permanent dock, so there are no rotating pressure seals.
  • Triple hull at 100/66/33 kPa: three ~18 cm steel shells with 3 cm gaps. 12 serpentine steel bulkheads 50 m apart.
  • Spokes act as solar-updraft air heat transport lamontagne, 2023-09-28. Shield ~6–7 t/m² lamontagne, 2024-03-20.
  • Armstrong factory lamontagne, 2023-10-02; lamontagne, 2023-10-02; lamontagne, 2023-10-02:
  • The construction factory for Avalon: a fixed hub + two counter-rotating 200 m rings mostly open to space, 1 g at 3 rpm.
  • Process decks (separation works better in gravity, and is Earth-testable); two habitats per ring; teleoperation.
  • Island Zero (Jerry Stone) lamontagne, 2026-07-05; lamontagne, 2026-07-08; lamontagne, 2026-08-20:
  • A variable-gravity experimentation and general-use station, precursor to Avalon.
  • Updated from Skylon-launched inflatables to rigid Starship modules at 1.0, 0.9, 0.8 and 0.7 g.
  • Tension rods carry the loads; Vast-derived modules with 2.9 m ports and observation domes; 15 × 5 m modules.
  • BIS SPACE drum-station construction jig using a Strickland triangular truss lamontagne, 2024-02-11.
  • Orbital Settlement Project (2nd year): works backwards from Avalon to the first station, then onward to a solar-system society (avalonspace1.wordpress.com) lamontagne, 2026-09-18.
  • Papers: JBIS v73 no. 6 (Avalon life support), v73 no. 10 (sizing practices) lamontagne, 2023-10-19. Active shielding was deemed too power-hungry lamontagne, 2023-09-14.

Critiques raised

  • Twark_Main: a triple hull accumulates fatigue cycles equally in all layers, so failures are correlated Twark_Main, 2023-09-29.

Open questions

  • Can the magnetic perimeter suspension between counter-rotating shells be made fail-safe?

Sources

Forum posts

External references

  • JBIS 72(9) 2019; 73(6) and 73(10) 2020.
  • avalonspace1.wordpress.com